Showers, floors, backsplashes, fireplaces. Hand-set by the two owners, waterproofed to last, with grout lines you will want to look at.
Most remodelers treat tile as the last thing before the walk-through. We treat it as the reason the job lasts. A shower fails behind the tile long before you see it on the surface, so we waterproof every pan and wall the right way, flatten the substrate, and only then start setting.
Tyler and Brian cut and set every piece by hand. 1/16-inch grout lines. Bullnose and mitered corners where they belong. Color-matched silicone on every inside corner and change of plane, never a bead of raw caulk. That’s the difference you feel ten years in.
Curbless or curbed, custom niches, full-height walls. Schluter waterproofing under every inch.
Large-format, wood-look plank, stone. Flattened substrate, proper movement joints, no lippage.
Subway, mosaic, slab. Tied to the countertop, scribed to the cabinets, outlets planned around the pattern.
Heated-mat ready, slip-rated, pitched right to the drain on curbless builds.
Floor-to-ceiling surrounds, hearths, feature walls. The detail piece that makes the room.
Leaking showers and cracking grout fixed at the cause, back to the studs when it has to be.
Every photo is a Bluerock project. No stock, no renders. See the full gallery →



Porcelain, ceramic, natural stone, large-format, mosaic, marble, herringbone and other patterns. Showers, floors, backsplashes, tub surrounds, fireplaces, and entryways. If it’s tile, it’s what we do.
It’s all in the prep and the lines. Proper waterproofing behind every shower, dead-flat substrates, 1/16-inch grout lines, and color-matched silicone, not raw caulk, on every change of plane. We’re tile-first; the brand name is ‘Tile, done right.’
Often. If a shower is leaking or the grout is cracking, the problem is behind the tile, not on it: missing waterproofing or a bad substrate. We tear it back to the studs when we have to and rebuild it so it lasts.
See your design first. You only move forward if you love it.